Though there were some minor hiccups that were able to be patched up by South Bend's own construction class, the Koplitz Field House's wood floor will ultimately have to be replaced. The school has also hired a company to make repairs to the gym, making "flood cuts" in the walls that were affected in order to dry them out from the inside. The school is looking to replace the floor in June, due to irreparable damage underneath the floor. Until then, the floor and structure have been deemed dry, disinfected, and safe to use. Graduation is still slated to be hosted at Koplitz Field House as well.